features /
crane lifting
installation methods
PRE-DRILLED SECTIONS

Edge protection attached prior to hoisting steel.


NON-DRILLED SECTIONS

Edge protection attached prior to hoisting steel.

Temporary Edge protection (TEP) system attached to steel section prior to hoisting.
Pre-installed TEP system
during hoisting.

Steel section erected with TEP system pre-installed.


RETRO FIT ONTO ERECTED STRUCTURES